Traffic Engineering for Private Development

From site feasibility and Traffic Impact Analyses to agency coordination and final approval, GKW helps developers, architects, and civil engineering teams navigate traffic requirements and keep projects moving across Texas.

25+
YearsTexas experience
In-House
Traffic Datacollection
TIA
Traffic Studies & AnalysisFeasibility through approval
Agency
CoordinationSan Antonio & Texas
Common Questions
Do You Need a Traffic Study?

Most developers ask the same handful of questions before they ever call a traffic engineer. Here's where to start.

Q&A

Do I need a Traffic Impact Analysis?

It depends on the reviewing agency's thresholds for your development's size, land use, and location. GKW can review your project address, proposed land use, and approximate size and tell you whether a full TIA, a smaller traffic memorandum, or no study at all is likely to be required.

Q&A

What will the reviewing agency require?

Requirements vary by jurisdiction and by how much traffic your development is expected to generate. GKW coordinates directly with the reviewing agency to scope the study up front, so you know what's required before work begins.

Q&A

Which agency reviews my project?

Depending on where your site sits, that could be a city, county, or TxDOT district anywhere in Texas. GKW coordinates directly with the reviewing agency and can confirm which one applies to your project.

Q&A

Can GKW work alongside my project team?

Yes. GKW can serve as the traffic department for civil engineering and site-development firms that don't maintain a strong in-house traffic group — providing counts, TIA scoping, Synchro analysis, access recommendations, and agency coordination while your firm retains the overall client relationship.

Services
Traffic Engineering for Development Projects

From a quick threshold check to a full multi-intersection study, GKW scopes the work to match what your project and reviewing agency actually require.

01

Traffic Impact Analyses & Studies

Full TIAs and traffic impact studies covering trip generation, distribution, and level-of-service analysis for developments of any size.

TIALevel of ServiceTrip Generation
02

TIA Threshold Assessments

An initial review of your project address, land use, and size to determine whether a full study, a smaller memorandum, or no study is likely required.

Threshold ReviewScoping
03

Trip-Generation Letters & Traffic Memoranda

Shorter-form documentation for projects that don't need a full TIA but still require agency-facing traffic documentation.

Trip GenerationTraffic Memo
04

Driveway, Access & TxDOT Permit Support

Driveway and access-management analysis, including support through the TxDOT driveway permit process where state right-of-way is involved.

Access ManagementTxDOT Permits
05

Turn-Lane, Signal-Warrant & Queueing Analyses

Turn-lane warrant studies, signal warrant analysis, and queueing/stacking analysis to support site access and driveway design.

Signal WarrantsQueueing Analysis
06

Parking & Circulation Studies

Site circulation and parking studies, including school pickup/drop-off circulation analysis for institutional and mixed-use sites.

Circulation StudiesParking Studies
07

Traffic Counts & Synchro/SimTraffic Modeling

In-house traffic counts paired with Synchro and SimTraffic modeling to support analysis and mitigation concepts.

In-House CountsSynchroSimTraffic
08

Agency Coordination

Direct coordination with cities, counties, and TxDOT districts throughout Texas during review and approval.

Cities & CountiesTxDOT

TxDOT Precertified in 20+ Categories

GKW is TxDOT-precertified across more than 20 engineering categories, supporting the firm's qualifications for TxDOT and other transportation assignments throughout Texas.

Jurisdictions
Texas-Wide TIA Support for Reviewing Agencies

We prepare traffic impact analyses (TIAs) and coordinate with agencies across Texas—so your project meets review requirements wherever it’s located.

Proof of Work

Proven TIA Experience Across Private Development

For more than 25 years, GKW Engineering has supported private development throughout Texas with traffic impact analyses and transportation engineering services. Our experience spans commercial, residential, mixed-use, industrial, institutional, and other development projects—from focused site evaluations to complex developments requiring detailed traffic analysis and agency coordination.

The projects below represent a selection of GKW’s private-sector TIA experience and demonstrate the range of developments, traffic conditions, and transportation challenges our team has helped clients navigate.

Multifamily TIA

Vantage at New Braunfels Apartments — Multifamily TIA

GKW prepared a Traffic Impact Analysis for the proposed Vantage at New Braunfels Apartments, a 288-unit mid-rise apartment complex on a 16-acre tract along FM 1101 near S. Kowald Lane, just east of IH-35. GKW studied FM 1101 at S. Kowald Lane and at the S. School Driveway/S. Vantage Driveway, both located near a Comal ISD elementary school zone. Synchro analysis found the development's driveway intersection would operate at an acceptable level of service (a high LOS C in the AM peak, close to LOS B, and LOS B in the PM peak) at full build-out, with no additional roadway improvements required.

New Braunfels, TX288 Units16 Acres
Winery / Hospitality · TxDOT Access Study

Halter Ranch Texas — Auxiliary Lane & Access Study

GKW performed a TxDOT-required engineering study for a proposed winery and tasting room — permitted under the project name Santafina Winery — a 24,600-square-foot building including a 3,500-square-foot tasting room along US Highway 290 outside Fredericksburg. Following the TxDOT Access Management Manual, GKW collected a weekend 24-hour traffic count, analyzed Saturday and Sunday peak-hour conditions in Synchro, and evaluated the proposed driveway against TxDOT's auxiliary-lane thresholds. The study found the new site-generated traffic would not trigger a requirement for turn lanes or deceleration/acceleration lanes, and confirmed no sight-distance deficiency at the roadway's 60-mph design speed. GKW recommended a single full-access driveway with a 35-foot curb radius and 45-foot throat width to safely accommodate delivery trucks. The site opened to the public in 2024 as Halter Ranch Texas.

Fredericksburg, TX24,600 SFTxDOT Study
Retail & Fuel TIA Consistency Analysis

H-E-B at Alamo Ranch — Grocery Store & Fuel Station

GKW prepared a trip-generation consistency analysis for a proposed 102,000-square-foot H-E-B supermarket and an 8-position gas station with convenience store and car wash at Alamo Parkway and Alamo Ranch Parkway in San Antonio. Working with the City of San Antonio's Development Services Department, GKW demonstrated that the proposed development's trip generation was consistent with the land use already accounted for in the area's original master-planned Traffic Impact Analysis — satisfying the City's requirements without triggering a new or updated TIA study.

San Antonio, TX102,000 SF H-E-BBexar County
Multifamily TIA

Vantage at Corpus Christi Apartments — Multifamily TIA

GKW prepared a traffic engineering study for the proposed Vantage at Corpus Christi Apartments, a 288-unit mid-rise complex on a 20-acre tract along Up River Road. GKW's field investigation found significant vehicle queuing at the nearby Up River Road/Deer Run intersection during drop-off and pick-up times at an adjacent elementary school, and provided the school and City with recommendations for managing that existing congestion. GKW's analysis found the proposed development's own traffic would have no significant impact on the intersection, which would continue operating at an acceptable level of service (LOS A during the regular PM peak, LOS B during school peak periods) at full build-out.

Corpus Christi, TX288 Units20 Acres
Multifamily TIA · Level 1 (City of Boerne)

Vantage at Boerne Apartments — Multifamily TIA

GKW prepared a Level 1 Traffic Impact Analysis, per City of Boerne ordinance, for the proposed Vantage at Boerne Apartments, a 288-unit apartment complex on a 17.5-acre tract along Old San Antonio Road near Cascade Cavern, adjacent to Boerne Middle School South. GKW studied four intersections along the corridor and found that while most needed no changes, the Old San Antonio Road/Cascade Cavern intersection required roadway improvements regardless of the new development — recommending a new right-turn lane, a two-way left-turn lane tapering into dedicated left-turn lanes, and a teardrop median for the westbound approach. GKW also ran AutoTURN fire-truck turning simulations to confirm the development driveway's radii were adequate for emergency vehicle access.

Boerne, TX288 Units17.5 Acres
Restaurant Traffic Memorandum

sMAC'n Noodles — Take-Out Restaurant Traffic Memo

GKW prepared a Traffic Memorandum for a proposed 2,400-square-foot fast-casual, take-out-only restaurant occupying a former florist building at 1515 N. Walnut Avenue (SH-46) in New Braunfels. Using the City of New Braunfels TIA Worksheet, GKW found the new use would generate approximately 3 AM and 30 PM peak-hour trips — a modest net increase over the prior florist use and well below the City's 100-peak-hour-trip threshold requiring a full TIA. GKW confirmed the site's existing full-access driveway, shared internal circulation with the adjacent Jolt Coffee development, and the two-way left-turn lane on SH-46 would continue to operate adequately with no additional roadway improvements needed.

New Braunfels, TX2,400 SFTraffic Memo
Residential TIA · Prime Consultant

Sedona Ranch — Residential Development TIA

GKW prepared a Level 3 Traffic Impact Analysis for a large-scale, two-phase residential development in San Marcos, TX: Phase 1 comprising 266 single-family units and Phase 2 expanding to 2,316 single-family lots. GKW evaluated all proposed access points, intersection warrants, driveway spacing, and site circulation to ensure adequate traffic operations on the surrounding street network at full buildout. The study included trip generation, directional distribution, background growth projections, and level-of-service analysis at study-area intersections under existing, interim, and ultimate conditions. Findings informed turn-lane requirements, access control recommendations, and phased improvement obligations tied to development triggers — providing the developer and local jurisdiction a clear roadmap for transportation infrastructure commitments as the project builds out.

San Marcos, TX 2,582 Units Prime
Photo: Marquis at Crown Ridge
Multifamily TIA

Heights of Crownridge — 300-Unit Multifamily TIA

GKW prepared a Traffic Impact Analysis for a 300-unit, 18.28-acre multifamily development on Babcock Road in far northwest San Antonio. Site constraints — including a bridge structure and box culvert bordering the new Babcock Road intersection — limited how the access driveway could be built, so GKW redesigned the entrance location and turn-lane geometry to fit the site while meeting City design standards, coordinating the analysis through the City of San Antonio's permitting process.

San Antonio, TX300 Units18.28 Acres
Concept rendering · Cushman & Wakefield
Industrial & Warehouse TIA

South Hub Industrial Park — Warehouse & Distribution TIA

GKW prepared a Traffic Impact Analysis for a five-building, 588,880-square-foot warehouse and distribution development on 48.28 acres in Travis County, near Austin. GKW's signal warrant analysis showed the project's driveway would meet peak-hour signal warrants at build-out, and GKW coordinated with Travis County, the City of Austin, and TxDOT to scope improvements at three intersections — clearing a path for a project of this scale to move forward.

Austin, TX588,880 SF48.28 Acres
Mixed-Use TIA

Yarrington Road Development — Multi-Phase Mixed-Use TIA

GKW prepared a Traffic Impact Analysis for a 16.91-acre, three-phase mixed-use development in San Marcos, TX — a gas station and convenience store, a 10,175-square-foot retail center, and 188 multifamily units built out in stages. Field data collection was disrupted by the COVID-19 pandemic, so GKW worked with the City of San Marcos to base the analysis on historical counts instead. GKW's turn-lane, signage, and signal-timing recommendations at the site's key intersections kept every studied movement at an acceptable level of service through full build-out.

San Marcos, TX16.91 Acres3 Phases
Retail & Drive-Thru TIA

Cotton Tail Lane — Retail & Drive-Thru TIA

GKW prepared a Traffic Impact Analysis for a 1.4-acre shopping center and fast-food drive-thru development at the intersection of Cotton Tail Lane and the Loop 1604 West Frontage Road in San Antonio. The analysis found that right-turning traffic from the frontage road would exceed the City's threshold for a mandatory deceleration lane, so GKW designed a 200-foot right-turn lane and driveway layout coordinated with TxDOT and VIA Metropolitan Transit — including relocating an affected bus stop — to keep the development's access safe and code-compliant.

San Antonio, TX1.4 AcresRetail + Drive-Thru
School Circulation & Safety

George Gervin Academy — School Circulation & Safety

GKW prepared a Traffic Impact Analysis and circulation design for a 188-student elementary charter school on a 2.98-acre site on Blanco Road in San Antonio. GKW identified that left-turn exiting traffic could queue back onto Blanco Road during pick-up and drop-off, and designed a two-driveway circulation plan — peak-hour turn restrictions, dedicated signage and pavement markings, and solar-powered school-zone flashers — that kept exit queuing safely within the site.

San Antonio, TX188 Students2.98 Acres
Convenience Store TIA

US Global Fuels — Convenience Store & Fuel Pumps TIA

GKW prepared a Traffic Impact Analysis for a 5,500-square-foot convenience store with eight fuel pump positions in Travis County. GKW's study found that two adjacent intersections were already operating at failing levels of service before the project was proposed, so GKW recommended new traffic signals at both — improving conditions dramatically — alongside a channelized entrance designed for delivery and fuel trucks.

Austin, TX1.5 Acres8 Fuel Positions
Mixed-Use TIA

The City Box at Babcock — Mixed-Use TIA

GKW prepared a Traffic Impact Analysis for a mixed-use development on Babcock Road in San Antonio combining multifamily units, a restaurant, and a variety store. GKW's study distinguished between traffic caused by the new development and a pre-existing capacity issue driven largely by nearby school traffic — keeping the client from being assigned costs for improvements the development didn't cause — while designing two new driveways that operate at an acceptable level of service.

San Antonio, TXMixed-Use2 New Driveways
Office & Retail TIA

Loop 410 Lot 8 — Office & Retail TIA

GKW prepared a Traffic Impact Analysis for a 2.83-acre office and retail development on the NW Loop 410 frontage road in San Antonio, coordinated during an active TxDOT ramp-relocation project nearby. GKW designed the site's driveway to work around the ramp's new location and confirmed the development's traffic fell below the City's improvement threshold — meaning no additional roadway infrastructure was required.

San Antonio, TX2.83 AcresOffice + Retail
Mixed-Use TIA · Level 2

McQueeney Tract — Mixed-Use TIA & Signal Warrant Study

GKW prepared a Level 2 Traffic Impact Analysis for the McQueeney Tract, a mixed-use development along FM 725 near New Braunfels combining a gas station and convenience store (12 fueling positions), a fast-food restaurant with drive-through, mid-rise multifamily housing, and single-family detached housing. Following the City of New Braunfels TIA ordinance and TxDOT guidelines, GKW's Synchro analysis found the development's full-access driveway on FM 725 would operate at an unacceptable level of service by the 2027 build-out year without improvements, and GKW's signal warrant analysis confirmed a traffic signal was warranted at the site. GKW recommended a full-access driveway with a new traffic signal, northbound and southbound right-turn lanes with 415-foot storage and 100-foot tapers, and roadway striping improvements on FM 725.

New Braunfels, TXMixed-UseLevel 2 TIA
Why GKW
A Traffic Department for Your Project Team

GKW can serve as the traffic department for civil engineering and site-development firms that don't maintain a strong in-house traffic group — providing counts, TIA scoping, Synchro analysis, access recommendations, and agency coordination while your firm retains the overall client relationship. Backed by 25+ years serving Texas, TxDOT precertification across 20+ categories, and GKW's own in-house data collection.

Local Agency Knowledge

Direct, established coordination with cities, counties, and TxDOT districts across Texas.

In-House Data Collection

Traffic counts and field data collected by GKW's own staff, not a third party.

PE-Led Analysis

Studies and recommendations led by GKW's licensed traffic engineering staff.

Process
How a Private Development Study Moves Forward
STEP 1
Initial Review. Send GKW the project address, proposed land use, and approximate size for an initial read on likely traffic-study requirements.
STEP 2
Agency Scoping. GKW coordinates with the reviewing agency to confirm the required study type and scope.
STEP 3
Analysis. Trip generation, traffic counts, and Synchro/SimTraffic modeling as scoped for your project.
STEP 4
Recommendations. Access, turn-lane, signal-warrant, and mitigation recommendations based on the analysis.
STEP 5
Approval Support. GKW addresses agency comments and supports the development team through to final concurrence.

Planning a new development?

Send us the project address, proposed land use, and approximate size — GKW can provide an initial read on the likely traffic-study requirements.

Discuss Your Project☎ Call GKW